JavaScript is required to use content on this page. Please enable JavaScript in your browser.
a(1) Channel and Harbor Navigation Aids (PDF)
a(2) State Regulatory Markers (PDF)
a(3) Piers (PDF)
a(4) Marina/Community Piers Reconfiguration (PDF)
a(5) Boat Ramp Construction, Repair, Expansion, and Replacement (PDF)
a(6) Mooring Buoys (PDF)
a(7) Structures in Fleeting and Anchorage Areas (PDF)
a(8) Temporary Recreational Structures (PDF)
a(9) Maintenance Dredging Of Previously Authorized Dredged Areas In Tidal Waters (PDF)
a(10) New Minor Dredging in Tidal Waters (PDF)
b(1) General Maintenance (PDF)
b(2) Armoring Bridges, Causeways, and Culverts (PDF)
b(3) Bulkhead Repair or Replacement, Including Stone Toe Protection (PDF)
b(4) Maintenance of Existing Drainage Ditches (PDF)
c(1) Utility Lines (PDF)
c(2) Foundations for Overhead Utility Line Towers, Poles, Anchors, and Minor Attendant Features for Subsurface Utility Lines (PDF)
c(3) Utility Access Roads (PDF)
d) Linear Transportation Activities (PDF)
e(1) Minor Nontidal Fills (PDF)
e(2) Agricultural Activities (PDF)
e(3) Soil Investigations, Scientific Measurement Devices, and Survey Activities (PDF)
e(4) Dry Fire Hydrants (PDF)
e(5) Clearing Debris and Windfalls (PDF)
e(7) Temporary Construction, Access, Stream Diversions, and Dewatering for Construction (PDF)
e(8) Outfall Structures And Associated Intake Structures (PDF)
e(9) Residential, Commercial, Institutional Development Activities and Recreational Facilities (PDF)
e(10) Stormwater Management Facilities (PDF)
e(11) Aquatic Habitat Restoration, Enhancement, and Establishment Activities Associated with Compensatory Mitigation Requirements for Aquatic Resource Impacts Authorized Under the MDSPGP-7 (PDF)
f(1) Tidal Revetments and Other Tidal Shoreline Erosion Control Structures (PDF)
f(2) Living Shorelines/Beach Nourishment (PDF)
f(3) New Bulkheads, Including Stone Toe Protection (PDF)
f(4) Nontidal Bank Stabilization Activities (PDF)
g) Return Water from Upland Contained Disposal Areas (PDF)
h) Private Landowner Oyster Gardening (PDF)
i) Emergency Situations (PDF)
j(1) Chesapeake Bay Total Maximum Daily Load (TMDL)/Municipal Separate Storm Sewer Systems (MS4) Activities - Retrofits (PDF)
j(2) Chesapeake Bay Total Maximum Daily Load (TMDL)/Municipal Separate Storm Sewer Systems (MS4) Activities - New (PDF)
Maryland State Programmatic General Permit-7 MDSPGP-7 (effective October 1, 2026) from the Army Corps of Engineers website
Water Quality Certification document, MDSPGP-7, 25-WQC-0011 - Effective December 3, 2025
Coastal Zone Consistency Determination document, MDSPGP-7 - December 3, 2025
We're available on the following channels.